Built prefabricated house in Momino.

 A fully finished low-energy prefabricated house built by ECOZID in Momino village, Bulgaria in 2016.  The stage of completion for this built prefabricated house in Momino chosen by the client is Turnkey Construction. The total built-up area is 198.71 square meters. Heat pumps are used for heating the prefabricated house and heating the hot water for domestic needs, which draw energy from the atmospheric air and solar radiation. This is an innovative method for Bulgaria, which provides exceptional savings in the operation of the prefabricated home. Wastewater is treated by a local treatment plant.

 Turnkey Construction is an all-inclusive service for those clients, who want to reach the desired goal quickly and stress-free. With this ECOZID's option, the clients receive perfect final quality in combination with a maximum guarantee for the complete reference date.